Installation of the Marley NC cooling towers at the LVN Limited company

2017-07-17


Supply – 2017

Place – Dunayivtsi, Khmelnitsky region

Installation – on the prepared foundations

Height – 1,2 m

Production – oil extraction

Appointment of a cooling tower – cooling of water for three revolving cycles

 

Technical characteristics of the tower

  • Model – NC8401HAN1FRK
  • CTI certificate – STD-201
  • Electromotor – TEC Motors 5.5 kW
  • The volume of recycled water – 100 m3 / hour
  • The thermal productivity of a cooling tower –  810, 26 kW
  • Hot water (input) – + 35 0C
  • Cold water (output) – + 28 0C
  • Temperature of wet bulb – + 22 0C
  • Noise level – 77 db

 

Technical characteristics of the tower

  • Model – NC8409UAN2FRK
  • CTI certificate – STD-201
  • Electromotor – TEC Motors 37 kW
  • The volume of recycled water – 900 m3 / hour
  • The thermal productivity of a cooling tower – 7294,7 kW
  • Hot water (input) – + 34 0C
  • Cold water (output) – + 27 0C
  • Temperature of wet bulb – + 22 0C
  • Noise level – 77 db

 

Material of new cooling towers

  • Caracas – galvanized steel
  • Plating – strengthened fiberglass